welcome to link-run!
Ocean Shipping News | Air Shipping News | Logistics News | Trade News | Conference And Exhibition
Link-Run Logistic--Link-Run, being a Chinese Logistics leader
             

Tianjins Dongjiang Bonded Port Area first phase opens December 8

source:SchedNet author:time:2007-11-13
Font Set [large][medium][small]

THE four-kilometre first phase facility of port of Tianjin's Dongjiang Bonded Port Area is scheduled to commence operation on Saturday December 8, Xinhua reported.

The facility includes six berths costing CNY6.6 billion (US$891 million) with an aggregate capacity of 4 million TEU, and covering a quay length of 2,300 metres. Quay cranes and gantries have been installed and test runs are scheduled for the end of November.

The Dongjiang Bonded Port Area is the largest of its kind in China, covering a space of 10 square kilometres and will operate like a free port or a free trade zone. The bonded port area will be completed by 2010, when Tianjin's seaport throughput is expected to surpass 10 million TEU or 400 million tons, and airport throughput is supposed to reach 500,000 tons, with a trade value of US$200 billion.




Back   China Shipping buys 30pc of Port of Qinhuangdao   Next  SIPG plans raising mid-Yangtze Jiujiang port capacity to 3 million TEU